1. Ahamad, M. A., Arifin, K., Abas, A., Mahfudz, M., Cyio, M. B., Khairil, M., Ali, M.N., Lampe, I., & Samad, M. A. (2022). Systematic Literature Review on Variables Impacting Organization’s Zero Accident Vision in Occupational Safety and Health Perspectives. Sustainability, 14(13), 7523.
2. Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction delays in Florida: An empirical study. Final report. Department of Community Affairs, Florida, US.
3. Aladwani, A. M. (2002). IT project uncertainty, planning and success: An empirical investigation from Kuwait. Information Technology & People.
4. Ali, M. X. M., Arifin, K., Abas, A., Ahmad, M. A., Khairil, M., Cyio, M. B., Samad, M.A., Lampe. I., Mahfudz, M. & Ali, M. N. (2022). Systematic literature review on indicators use in safety management practices among utility industries. International journal of environmental research and public health, 19(10), 6198.
5. AlSehaimi, A., Koskela, L. and Tzortzopoulos, P. (2013). The need for alternative research approaches in construction management: The case of delay studies. Journal of Management in Engineering, 29: 407–413.
6. Arifin, K., Isa, W. M. Z. W., Zaini, Z. A. H., & Sahimi, A. S. (2021). Persepsi Terhadap Perlaksanaan Pengurusan Keselamatan dan Kesihatan Pekerjaan oleh Kakitangan Awam di Putrajaya, Malaysia. e-Bangi, 18(2), 198-212.
7. Arifin, K., Juhari, M. L., Khairil, M., Mahfudz, M., & Samad, M. A. (2021). Faktor Organisasi dalam Menyumbang Kepada Kemalangan Pekerjaan Industri Pembinaan Rel Mass Rapid Transit (MRT) di Malaysia. Akademika, 91, 17-32.
8. Ariola, M.M. (2006). Principles and Methods of Research. Edisi Pertama. Manila: Rex Book Store Inc.
9. Chaves, M. S., Araújo, C., Teixeira, L. R., Júnior, I. G., Rosa, D., & Nogueira, C. D. (2016). A new approach to managing lessons learned in the PMBoK process groups: the Ballistic 2.0 Model. International Journal of Information Systems and Project Management (IJISPM).
10. Chong, J. M. (2011). Penyediaan ringkasan projek (Project Brief) bagi projek pembinaan (Doctoral dissertation, Universiti Teknologi Malaysia).
11. Doloi, H. (2013). Cost overruns and failure in project management: Understanding the roles of stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3),267–279.
12. Dvir, D., Raz, T., & Shenhar, A. J. (2003). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, 21(2), 89-95.
13. Elawi, G. S. A., Algahtany, M., & Kashiwagi, D. (2016). Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia. Procedia Engineering, 145, 1402-1409.
14. Flyvbjerg B., Holm M.S., & Buhl S., (2002), Underestimating costs in public works projects, APA Journal, Summer, Vol.68. No.3,pp. 279-295.
15. Halim, A. H. A., & Zin, R. M. (2016). Causes of Delay in the Planning and Design Phases for Public Works Department Construction Projects. Malaysian Journal of Civil Engineering, 28(3).
16. Han, S. H., Yun, S., Kim, H., Kwak, Y. H., Park, H. K., & Lee, S. H. (2009). Analyzing schedule delay of mega project: Lessons learned from Korea train express. IEEE Transactions on Engineering Management, 56(2), 243-256.
17. Islam, M. S., Nepal, M. P., Skitmore, M., & Kabir, G. (2019). A knowledge-based expert system to assess power plant project cost overrun risks. Expert Systems with Applications, 136, 12-32.
18. Kerzner, H. (2006). Project management: A systems approach to planning, scheduling and controlling (9th ed.). New York: John Wiley and Sons.
19. Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254-260.
20. Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. A. (2010). Factors affecting construction cost in Mara large construction project: perspective of project management consultant. International Journal of Sustainable Construction Engineering and Technology, 1(2), 41-54.
21. Ndame, E. & Dakas, I. (2019). Analysis of delay factors at the pre-contract phase of public private partnership project in Abuja, Nigeria. International Journal of Environmental Studies and Safety Research.
22. Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: traditional contracts. International Journal Of Project Management, 20(1), 67-73.
23. Oglesby, R. J., & Erickson, D. J. (1989). Soil moisture and the persistence of North American drought. Journal of Climate, 2(11), 1362-1380.
24. Phullsunder, S. (2019). The Impact of Effective Planning on Project Success: A Literature Review. International Research Journal of Engineering and Technology, 6(2), 1–3.
25. Pinto, J. K., & Slevin, D. P. (1988, February). Project success: definitions and measurement techniques. Newton Square, PA: Project Management Institute.
26. Project management institution (2004). A guide to project management body of knowledge. PMI, Pennsylvania, USA.
27. Renuka, S. M., & Umarani, C. (2018). Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), 63-85.
28. Rezouki, S. E., & Hassan, J. K. A. (2019). An evaluation of barriers obstructing the applicability of Public Private Partnership (PPP) in infrastructure development. Civil Engineering Journal, 5(12), 2643-2664.
29. Rivera, L., Baguec, H., & Yeom, C. (2020). A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries. Infrastructures, 5(10), 84.
30. Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517-526.
31. Serrador, P. (2013). The impact of planning on project success-a literature review. The Journal of Modern Project Management, 1(2).
32. Susanti, R. (2020). Cost overrun and time delay of construction project in Indonesia. In Journal of Physics: Conference Series (Vol. 1444, No. 1, p. 012050). IOP Publishing.
33. Tesfaye, E., Lemma, T., Berhan, E., & Beshah, B. (2017). Key project planning processes affecting project success. International Journal for Quality Research, 11(1).
34. Venkateswaran, C. B., & Murugasan, R. (2017). Time delay and cost overrun of road over bridge (ROB) construction projects in India. Journal of Construction in Developing Countries, 22, 79-96.
35. Vilventhan, A. and Kalidindi, S.N. (2016), “Interrelationships of factors causing delays in the relocation of utilities: a cognitive mapping approach”, Engineering, Construction and Architectural Management, Vol. 23 No. 3, pp. 349-368.
36. Yang, J. B., & Wei, P. R. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16(2), 80-83.
37. Yau, N. J., & Yang, J. B. (2012). Factors causing design schedule delays in turnkey projects in Taiwan: An empirical study of power distribution substation projects. Project Management Journal, 43(3), 50-61.
38. Zidane, Y. J. T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business.
39. Zwikael, O., & Sadeh, A. (2007). Planning effort as an effective risk management tool. Journal of Operations Management, 25(4), 755-767.