1. Allahverdi, A. (2022). A survey of scheduling problems with uncertain interval/bounded processing/setup times. Journal of Project Management, 7, 255-264.
2. Allahverdi, A. (2008). Three-machine flowshop scheduling problem to minimize makespan with bounded setup and processing times. Journal of the Chinese Institute of Industrial Engineers, 25, 52-61.
3. Allahverdi, A., & Aydilek, H. (2010). Heuristics for the two-machine flowshop scheduling problem to minimize makespan with bounded processing times. International Journal of Production Research, 48, 6367-6385.
4. Allahverdi, A., & Mittenthal, J. (1994). Two-Machine Ordered Flowshop Scheduling Under Random Breakdowns. Mathematical and Computer Modelling, 20, 9-17.
5. Aydilek, H., & Allahverdi, A. (2013). A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times. Applied Mathematical Modelling, 37, 7164-7173.
6. Aydilek, A., Aydilek, H., & Allahverdi, A. (2017). Increasing the profitability and competitiveness in a production environment with random and bounded setup times. International Journal of Production Research, 51, 106- 117.
7. Aydilek, H., Aydilek, A., Allahverdi, M., & Allahverdi, A. (2022). More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness. International Journal of Industrial Engineering Computations, 13, 543-556.
8. Al-Anzi, F.S., & Allahverdi, A. (2013). An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time. Journal of Manufacturing Systems, 32, 825-830.
9. Garey, M.R., Johnson, D.S., & Sethi, R. (1976). The complexity of flowshop and jobshop scheduling. Mathematics of Operations Research, 1, 117-129.
10. Gonzalez-Neira, E.M., Ferone, D., Hatami, S., & Juan, A.A. (2017). A biased-randomized simheuristic for the distributed assembly permutation flowshop problem with stochastic processing times,” Simulation Modelling Practice and Theory, 79, 23-36.
11. Ng, C.T., Matsveichuk, N.M., Sotskov, Y. N., & Cheng, T.C.E. (2009). Two-machine flow-shop minimum-length scheduling with interval processing times. Asia-Pacific Journal of Operational Research, 26, 715-734.
12. Sotskov, Y.N., Allahverdi, A., & Lai, T.C. (2004). Flowshop scheduling problem to minimize total completion time with random and bounded processing times. Journal of Operational Research Society, 55, 277-286.
13. Sotskov, Y.N., Matsveichuk, N.M., Kasiankou, A. A., & Werner, F. (2014). Time management based on two-machine flowshop scheduling with uncertain job processing times. International Journal of Information Technologies Knowledge, 8, 212-224.