1. Al-Anzi, F. S., & Allahverdi, A. 2013. An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time. Journal of Manufacturing Systems, 32(4), 825-830.
2. Aydilek, A., Aydilek, H., Allahverdi, A. (2015). Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan. International Journal of Production Research, 53(9), 2803-2819.
3. Allahverdi, A, 1997. Scheduling in stochastic flowshops with independent setup, processing and removal times. Computers & Operations Research 24, 955-960.
4. Allahverdi, A. (2006). Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. International Journal of Production Economics, 103(1), 386-400.
5. Allahverdi, A., 2022. A survey of scheduling problems with uncertain interval/bounded processing/setup times. Journal of Project Management 7, 225-264.
6. Allahverdi, A., & Al-Anzi, F. S. 2006. Scheduling multi-stage parallel-processor services to minimize average response time. Journal of the Operational Research Society, 57(1), 101-110.
7. Allahverdi, A., Aydilek, H., 2010. Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times. International Journal of Production Research 48, 6367-6385.
8. Allahverdi, A., Aydilek, H. 2014. Total completion time with makespan constraint in no-wait flowshops with setup times. European Journal of Operational Research, 238(3), 724-734.
9. Allahverdi, A., Aydilek, H., & Aydilek, A. 2014. Single machine scheduling problem with interval processing times to minimize mean weighted completion time. Computers & Operations Research, 51, 200-207.
10. Allahverdi, A., & Mittenthal, J. 1998. Dual criteria scheduling on a two-machine flowshop subject to random breakdowns. International Transactions in Operational Research, 5(4), 317-324.
11. Diaz, H., Palacios, J.J., Diaz, I., Vela, C.R., Gonzalez-Rodriguez, I., 2022. Robust schedules for tardiness optimization in job shop with interval uncertainty. LOGIC JOURNAL OF THE IGPL, In Press.
12. Ruiz, R., Allahverdi, A., 2007. Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. Annals of Operations Research, 156, 143-171.
13. Ruiz, R., Allahverdi, A. (2009). New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness. International Journal of Production Research, 47(20), 5717-5738.
14. Ying, K.C., Lin, S.W., 2018. Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks. Expert Systems with Applications 92, 132-141.
15. Zhu, Z., Zhou, X., 2020. Flexible job-shop scheduling problem with job precedence constraints and interval grey processing time. Computers & Industrial Engineering 149, Article 106781.
16. Xie, N., Chen, N., 2018. Flexible job shop scheduling problem with interval grey processing time. Applied Soft Computing 70, 513-524.