1. Allahverdi, A., Aydilek, H. (2010a). Heuristics for two-machine flowshop scheduling problem to minimize makespan with bounded processing times. International Journal of Production Research, 48, 6367- 6385.
2. Allahverdi, A., and Sotskov, Y.N. (2003). Two-machine flowshop minimum length scheduling problem with random and bounded processing times. International Transactions in Operational Research, 10, 65-76.
3. Aydilek, H., and Allahverdi, A. (2010). Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time. Computers and Mathematics with Applications, 59, 684-693.
4. Gonzalez-Neira, E.M., Ferone, D., Hatami, S., Juan, A.A. (2017). A biased-randomized simheuristic for the distributed assembly permutation flowshop problem with stochastic processing times. Simulation Modelling Practice and Theory, 79, 23-36.
5. Kouvelis, P., Yu, G. (1997). Robust Discrete Optimization and its Applications. Kluwer Academic Publisher.
6. Lai, T.C., and Sotskov, Y.N. (1999). Sequencing with uncertain numerical data for makespan minimization”, Journal of the Operational Research Society, 50, 230-243.
7. Lai, T.C., Sotskov, Y.N., Sotskova, N.Y., Werner, F. (1997). Optimal makespan scheduling with given bounds of processing times. Mathematical and Computer Modelling, 26, 67-86.
8. Seidgar, H., Kiani, M., Abedi, M., et al. (2014). An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem”, International Journal of Production Research, 52, 1240-1256.
9. Sotskov, Y.N., Allahverdi, A., Lai, T.C. (2004). Flowshop scheduling problem to minimize total completion time with random and bounded processing times”, Journal of Operational Research Society, 55, 277-286.
10. Stefansson, H., Sigmarsdottir, S., Jensson, P., Shah, N. (2011). Discrete and continuous time representations and mathematical models for large productions scheduling problems: a case study from the pharmaceutical industry. European Journal of Operational Research, 215, 383-392.
11. Tayanithi, P., Manivannan, S., Banks, J. (1992). A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system. Journal of Manufacturing Systems, 11, 195-214.