1. Allahverdi, A., Aydilek, H. (2010a). Heuristics for two-machine flowshop scheduling problem to minimize makespan with bounded processing times. International Journal of Production Research, 48, 6367- 6385.
2. Allahverdi, A., Aydilek, H. (2010b). Heuristics for two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Computers and Mathematics with Applications, 60, 1374-1384.
3. Allahverdi, A., and Sotskov, Y.N. (2003). Two-machine flowshop minimum length scheduling problem with random and bounded processing times, International Transactions in Operational Research, 10, 65-76.
4. Chen, J.F. (2015). Unrelated parallel-machine scheduling to minimize total weighted completion time. Journal of Intelligent Manufacturing, 26, 1099-1112.
5. Kouvelis, P., Yu, G. (1997). Robust Discrete Optimization and its Applications. Kluwer Academic Publisher.
6. Lai, T.C., and Sotskov, Y.N. (1999). Sequencing with uncertain numerical data for makespan minimization”, Journal of the Operational Research Society, 50, 230-243.
7. Lai, T.C., Sotskov, Y.N., Sotskova, N.Y., Werner, F. (1997). Optimal makespan scheduling with given bounds of processing times. Mathematical and Computer Modelling, 26, 67-86.
8. Sotskov, Y.N., Allahverdi, A., Lai, T.C. (2004). Flowshop scheduling problem to minimize total completion time with random and bounded processing times. Journal of Operational Research Society, 55, 277-286.
9. Tayanithi, P., Manivannan, S., Banks, J. (1992). A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system. Journal of Manufacturing Systems, 11, 195-214.