1. Abdul Rahman, I., Memon, A. H., Nagapan, S., Latif, I., Alias, Q. B., Azis, A., & Asmi, A. (2012). Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences. 1(1)
2. Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S. (2018). The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies. Safety and Health at Work, 9(1), 115–124. https://doi.org/10.1016/j.shaw.2017.05.004
3. Cohen, J. (1998). Statistical Power Analysis for the Behavioral Sciences.
4. Eng. Jaser Hmaid Abu Mousa. (2005). Risk Management in Construction Projects from Contractors and Owners" perspectives. Islamic University of Gaza.
5. Euripides, R. A. (2008). TROUBLED PROJECTS IN CONSTRUCTIONS DUE TO (Issue June). City University of Seattle.
6. Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of project management, 21(5), 321-326.
7. Gajewska, E., & Ropel, M. (2011). Risk Management Practices in a Construction Project – a case study.
8. Gündüz, M., Nielsen, Y., & Özdemir, M. (2013). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of management in engineering, 29(2), 133-139.
9. Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013). Analysis of non-excusable delay factors influencing contractors' performance in Lagos state, Nigeria. Journal of Construction in Developing Countries, 18(1), 53.
10. Jongo, J. S., Tesha, D. N., Kasonga, R., Teyanga, J. J., & Lyimo, K. S. (2019). Mitigation Measures in Dealing with Delays and Cost Overrun in Public Building Projects in Dar-Es-Salaam, Tanzania.
11. Kim, S. Y., Van Tuan, N., & Ogunlana, S. O. (2009). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39-50.
12. Menon, J. (2017). Government-Linked Corporations: Impacts on the Malaysian Economy. Policy IDEAS, 45(December 2017), 1–26.
13. Mustaffa, N. K., Mat Isa, C. M., & Preece, C. N. (2020). Importance of Risk Management Knowledg in Career Advancement. Asian Journal of Research in Education and Social Sciences, 2(1), 15–26.
14. Nunnally, J. C. (1978). Nunnally on Reliability Nunnally.
15. Osipova, E. (2008). L ICE N T IAT E T H E S I S Risk management in construction projects : a comparative study of the different procurement options in Sweden.
16. Pallant, J. (2011). SPSS Survival Manual.
17. Subramanyam, B., & Iswarya, R. (2018). Troubled Projects in Construction Due To Scant Risk Management. International Journal of Engineering & Technology Website:, 7(3.12), 322–325.
18. Ramanathan, C., Narayanan, S. P., & Idrus, A. B. (2012). Construction delays causing risks on time and cost-a critical review. Construction Economics and Building, 12(1), 37-57.
19. Ruqaishi, M., & Bashir, H. A. (2015). Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. Journal of Management in Engineering, 31(3), 05014017.
20. Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International journal of Project management, 32(1), 101-115.